Tyring Work

5jul071

These pages show the progress of the tyre wall construction by date.

The main hut has been dug down 1.8m so will only be adding three rows of tyres above this along the back wall. The end and joining walls will be the main bulk of the tyring work. Finished ceiling height will be approximately 2.4m by the time the bond beam has been added.