Welcome to our earthship Earthship Get Started Book Recently Asked Questions The Build Gallery Earthship in the news Diary Recipes Earthship Living Ethical Fashion Links Books Contact us |
Jan 2014
and then he helped me with tyre in-fill in the utility room and kitchen area...
Bathroom floorWhile the brothers were cementing outside I finished the mud circle on the bathroom floor. It'll be under the sink unit so will be protected from water. The following week I oiled the tiled area, but couldn't do the semicircle as it was still damp. Ripped upWe've had some heavy duty winds lately, although nothing like the uk has been suffering. Anyway, the temporary roof we rigged up above the front doors (the black thing top right) was blown off. Not too major and sort of easy to repair. But while repairing it we, in our wisdom?, put the edge of the main roof bitumen OVER the edge of the temporary roof. Needless to say when the winds came, again, and blew it off, again, this time it ripped the main roof bitumen too - doh! Here's the repair that Dave and John made. Second stage tyre infillOn our own again, Dave and I did the second stage tyre in-fill in the kitchen area and I lime washed the walls in the utility room. Then, as I was doing some wall filling Dave started positioning the lath along the front face and finally we leveled the floor in the utility room - phew! Then January rolled into February.
Add your comment |